Full-Service Bathroom Remodeling

Bathroom Remodeling Services, Start to Finish

One team designs, builds, and installs your new bathroom: vanities, tile, showers, tubs, and fixtures. You deal with us, not five separate subcontractors, and nobody hands your job off halfway through.

★ Best of Houzz Service 2016–2025
★ NKBA Design Award Winner 2026
1,000+ kitchens & baths since 2011
14 showrooms · 7 states
4.8★ customer rating
60 minutes. No obligation. No charge. Bring rough measurements — or just ideas.
Luxury primary bathroom featuring a white freestanding soaking tub, gold fixtures, and a herringbone marble tile accent wall.
👥

One team, start to finish

One designer, one project manager, one point of contact, from first sketch to final walkthrough.
🖥️

Free 3D / VR design

Walk through your new bathroom before anything is ordered or demolished.
🪵

Vanities & cabinets in-house

Moisture-ready vanities, countertops, tile, and fixtures, selected and supplied by the same team.
🛡️

Licensed install, done right

Waterproofing, ventilation, and code-compliant plumbing and electrical by our own crews.
Bathroom Remodeling Company

A full-service bathroom remodeling company, built around your dedicated designer

We’ve designed and built kitchens and bathrooms since 2011, over 1,000 of them so far. That makes us a different kind of bathroom remodeling company: a cabinet store, a design studio, and a remodeling contractor under one name. When you remodel with us, the same company draws your bathroom, supplies the vanity and tile, and sends the licensed crew that installs it. Refresh or full renovation, you work with one team and one dedicated designer who owns the result from the first measurement to the final walkthrough.
Why we’re different

A cabinet store and a remodeling team — with one designer running it all

Most bathroom projects break at the handoff. You buy the vanity from one company, then hand the job to a separate contractor to install it, and when something goes wrong behind the tile, everyone blames someone else. We built USA Cabinet Store the other way around. Your design, your materials, and the crew that installs them all come from us, with one dedicated designer accountable from the first 3D consultation to the last piece of trim.
A real cabinet store

See and open the actual vanities

14 showrooms where you can compare real cabinetry, vanity tops, tile, and fixtures in person, straight from the lines we stock. No middleman, and no guessing from a website photo.
One dedicated designer

The same person, start to finish

The designer who builds your 3D design also guides your selections and lines up the permits and our own installers. One phone number, from the first consultation to the final walkthrough.
Single-source accountability

Design, products & build in-house

The design, the cabinetry, the tile, and the installation are all ours, right down to the waterproofing and ventilation you never see. Nothing gets lost in a supplier-to-contractor handoff.
It’s the difference between hiring a contractor and hiring the company that designs, supplies, and builds your bathroom.
Professional headshot of USA Cabinet Store CEO Emin Halac wearing a dark suit and burgundy shirt.
From our founder

“When the cabinet company and the contractor are two different businesses, the homeowner is left managing the gap between them. We built USA Cabinet Store to remove that gap. You work with one dedicated designer who owns your project from the first 3D rendering to the final walkthrough — the vanities, the tile, and the construction are all ours. That’s what single-source accountability really means: one team you can hold responsible for the whole bathroom.”

Emin Halac

Lead Designer & CEO, USA Cabinet Store
One-stop bathroom remodel

Everything your bathroom remodel includes

A complete bathroom remodel is more than a new vanity. We plan and install every element so it works together, so you only deal with one company.
Cabinets

Vanities & bathroom cabinets

Custom, semi-custom, and stock moisture-ready vanities and storage in the styles, finishes, and sizes that fit your space and budget. See bathroom cabinets →
Surfaces

Vanity tops & countertops

Quartz, granite, and marble vanity tops, custom-fit and easy to clean. Explore countertops →
Showers

Walk-in showers & tubs

Frameless and curbless walk-in showers, soaking and freestanding tubs, glass, and niches, all designed and waterproofed properly.
Detail

Tile & backsplash

Floor, wall, and shower tile with the substrate and waterproofing that protect it. Browse tile →
Floors

Non-slip flooring

Flooring chosen for safety, water resistance, durability, and easy cleaning.
Fixtures

Fixtures & faucets

Toilets, faucets, showerheads, mirrors, and lighting in finishes that match your design. See hardware →
Systems

Plumbing & ventilation

Licensed plumbing and electrical, GFCI circuits, and exhaust ventilation done to code to keep mold out.
Site

Demolition & waterproofing

Safe demolition, subfloor inspection, and the waterproofing membrane that prevents slow leaks below.
Why homeowners hesitate

Remove the uncertainty before the remodel starts

The hardest part of a bathroom remodel is trusting that it will go the way you were promised. Here is how our process answers the worries we hear most.

“I don’t know what it will cost.”

A clear estimate path

Review layout, product level, scope, and measurements, then get an itemized estimate before any final decisions, not a vague ballpark.
“I can’t picture the result.”

3D design before you order

See the vanity, shower, tile, and fixtures in a 3D rendering so there are no surprises on install day.
“There are too many choices.”

Guided material selection

Compare vanities, countertops, tile, fixtures, and finishes with a designer instead of guessing alone.
“We only have one bathroom.”

Realistic timeline & schedule

We give you an honest timeline, order materials before demo, and plan the work so you’re without the bathroom for as little time as possible.
“Who’s actually responsible?”

One team, one point of contact

One designer plans it, one project manager runs the install, and one person answers your questions. No finger-pointing between trades.
“I’ve heard contractor horror stories.”

Scope signed off in writing

Measurements, product details, and installation expectations are confirmed in writing before anyone picks up a tool.
“What if the crew just goes silent?”

Weekly updates, same-day replies

Your project manager sends a written weekly update and answers weekday messages the same day. No chasing a generic inbox.
“Will the last 10% ever get finished?”

A punch list that gets closed

Every project ends with a documented walkthrough and a written punch list, and final payment is held until every item is signed off.
“What if there’s water damage behind the walls?”

We open carefully, in writing

On older homes we assume nothing. We open carefully, document what we find with photos, and price any repair before continuing. Your contingency covers it, and if it goes unused, you keep it.
Our process · 6 steps

A simple, predictable bathroom remodeling process

A powder or hall bath usually takes about 4–7 weeks; a primary bath about 7–10 weeks. Here is exactly how it goes.

Consultation & goals

Talk through your goals, budget, style, and timeline so the right next step is clear from day one.
01
You get: project brief
Team: Designer

Measurements & discovery

We measure the space, flag layout constraints, and clarify what stays, moves, or changes.
02
You get: measured drawings
Team: Measure specialist
Lead-paint testing for homes built before 1978

3D design & layout

Visualize the vanity, shower, tub, tile, storage, and flow before you order.
03
You get: 3D renderings
Team: Designer · 3D specialist

Material selection

Choose vanities, tops, tile, fixtures, glass, hardware, and finishes with designer guidance.
04
You get: final selections sheet
Team: Designer
Compare real cabinet, counter & tile samples in the showroom

Scope, estimate & approval

Review product details, labor, budget drivers, and changes, then approve an itemized estimate.
05
You get: line-item estimate
Team: Designer · PM

Ordering, scheduling & install

We coordinate orders, delivery, permits, installation, quality review, and the final walkthrough.
06
Powder / hall bath: 4–7 wk · Primary bath: 7–10 wk
Permit 6–8 wk when required
The difference

A planned remodel feels different from the start

Here is how a typical bathroom project compares with the USA Cabinet Store way.

Most bathroom remodeling companies

The USA Cabinet Store way

What we remodel

From powder rooms to spa-like primary baths

Whatever the room and budget, our designers shape the layout around how you actually use it.

Primary / master bath

Double vanities, walk-in showers, freestanding tubs, and the storage a daily-use bath needs.

Full / hall bath

The family bathroom done right, with durable finishes, smart storage, and a tub or shower that fits.

Powder room

A small footprint with big impact: vanity, fixtures, tile, and lighting that make a statement.

Walk-in & curbless showers

Easy-entry, easy-clean showers with grab-bar blocking for comfortable aging in place. See vanity types →
Small room, many trades

Why a small bathroom remodel costs what it does

A bathroom looks small, but it’s the most trade-dense room in the house. A full bath usually needs six to eight specialists, each waiting on the one before, all squeezed into a tiny footprint. A lot of what you pay for is work you’ll never see: the waterproofing, the ventilation, and the blocking inside the walls that keeps the room sound for 20+ years.

The trades in a full bath, in order

  1. Demolition & subfloor inspection:check for rot, mold, sagging joists
  2. Plumbing rough-in:supply lines, drain moves, valve placement
  3. Electrical:GFCI circuits, exhaust fan, vanity & mirror lighting
  4. Framing & blocking:in-wall wood for grab bars, glass, shelving
  5. Waterproofing:the membrane behind the tile that stops slow leaks
  6. Tile:substrate, layout, cuts, grout
  7. Fixtures & glass:toilet, vanity, shower door, mirror
  8. Finish carpentry & paint:trim, caulk, moisture-resistant paint
Bathroom remodel cost

What a bathroom remodel costs in 2026

In 2026 the national average bathroom remodel runs about $16,500, and most projects land between $8,000 and $45,000, usually over 5 to 8 weeks. That covers everything from an affordable powder-room refresh to a custom, spa-like primary bath. Below is roughly what each project level runs; your free consultation pins down the exact figure. For the full breakdown, see our 2026 bathroom remodel cost guide.
Updated for 2026 Market Rates

Northern Virginia Remodeling Budget Planner

Provided by USA Cabinet Store

Beautiful Northern Virginia kitchen remodel by USA Cabinet Store

Project Configuration

Define your dream space and your live cost projection appears at the bottom.

Primary Project Focus

Core Dimensions & Locale

Length × Width of the room floor.

Helps us factor in local Arlington/Fairfax labor rates.

Bathroom Specialization

Homes 30+ years old often require plumbing updates.

Cabinetry & Built-ins

Leave blank and we'll estimate based on sq ft.

Surfaces

Optional. Appliances add cost only when selected.

Plumbing Systems

Masonry & Tile

🎨 Designer's Palette: These options represent curated showroom favorites. Our Fairfax and Chantilly locations feature thousands of additional hand-picked stone and mosaic options.

Enhanced Amenities

© USA Cabinet Store. All Rights Reserved.

Visit our official website: usacabinetstore.com

NOVA 2026 Pricing Index v3.0

Where we work

Bathroom remodeling across 7 states

With 14 showrooms in Virginia, Maryland, North Carolina, Texas, New Jersey, Florida, and Tennessee, USA Cabinet Store pairs the resources of a national bathroom remodeling company with local, licensed bathroom remodelers and a showroom near you. Compare tile and vanities in person, then have your project built and installed by our local crew.

Ashburn, VA
Chantilly, VA
Fairfax, VA
Tysons Corner, VA
Virginia Beach, VA
Annapolis, MD
Columbia, MD
Cherry Hill, NJ
Cary, NC
Nashville, TN
Houston, TX
Houston North, TX
Orlando, FL
Tampa, FL
Modern master bathroom with a skylight, freestanding soaking tub, and a frameless glass walk-in shower with stone tile.
What clients say

Rated 4.8★ across kitchen & bath projects

Homeowners come to us for cabinets and stay for the whole remodel. Verified reviews from Google and Houzz.
Free consultation

Start with a remodel plan, not guesswork

Talk with a designer about your goals, space, style, budget, and timeline — and leave knowing your next step.

FAQ

Bathroom remodeling questions, answered

Quick answers about cost, timeline, permits, walk-in showers, and choosing a contractor.
How much does a bathroom remodel cost?
In 2026, the national average bathroom remodel is about $16,500, and most projects run between $8,000 and $45,000. Your cost depends on the size of the room (powder, full/hall, or primary bath), whether the layout changes, the vanity and countertop, tile, the shower or tub, fixtures, and plumbing or electrical work. A powder room is the least expensive; a primary bath with a walk-in shower and freestanding tub is the most. The most accurate way to know your number is a free consultation and an itemized estimate. See our 2026 bathroom remodel cost guide for the full breakdown.
How long does a bathroom remodel take?
A powder room or hall bath typically runs about 4 to 7 weeks from first meeting to finished room; a primary bath is usually 7 to 10 weeks. Permits can add time when required, and older homes sometimes add a week or two for surprises behind the walls. Because most homes have limited bathrooms, we plan the schedule and material delivery up front so demolition only starts when everything is on-site.
Why does a small bathroom remodel cost so much?
The bathroom is the most trade-dense room in the home. Even a small bath usually needs six to eight specialists (demolition, plumbing, electrical, framing and blocking, waterproofing, tile, fixtures and glass, and finish carpentry), each dependent on the one before, all sequenced into a very small footprint. The cost reflects that labor density and the hidden work (waterproofing membrane, ventilation, in-wall blocking) that protects the room for decades.
Is remodeling a bathroom worth it?
For most homeowners, yes. Bathrooms are one of the rooms buyers scrutinize most, and a well-planned remodel improves daily comfort and resale appeal. Mid-range bathroom remodels typically return about 65–80% of their cost at resale, among the better home-improvement investments, and smart upgrades that improve function and storage tend to return more than purely luxury finishes.
Are walk-in showers a good idea?
For many homeowners, yes. Walk-in and curbless showers are easy to enter, easy to clean, and look open and modern. When we design one, we plan the waterproofing, slope and drain, glass, lighting, and (where you want to age in place) in-wall blocking for grab bars and a bench, so the bathroom stays safe and comfortable for years.
How do I choose a good bathroom remodeling contractor?
Confirm the company is licensed and insured, ask to see completed bathroom projects and reviews, and make sure you receive a written, itemized scope and estimate before any work begins. The advantage of a full-service company like USA Cabinet Store is that design, cabinetry, tile, and installation are handled by one team with one point of contact, so no one can pass the blame.
Do you offer free estimates and 3D design?
Yes. Your consultation, estimate, and a complete 3D design of your bathroom layout are free and come with no obligation. You can meet a designer at a showroom, in your home, or virtually.
Do you offer financing?
Yes. We offer no-interest payment plans for qualifying bathroom projects through our financing partners. Your designer will walk you through the available options after your free estimate.
Will my bathroom remodel need a permit?
Often, yes. Bathrooms usually involve plumbing and electrical work, which typically requires a permit, especially if the layout changes. Our team handles the permit process and inspections for you and builds the timeline into your plan. Homes built before 1978 also receive lead-paint testing.
Helpful resources

Start with clarity, before construction

Get design guidance, material direction, an honest budget conversation, and a step-by-step bathroom remodeling plan, at no cost.
1,000+ kitchens & baths since 2011 · 14 showrooms in 7 states · BBB Accredited · NARI & NKBA member · Best of Houzz Service 2016–2025